VARANASI: A proposed heavy-repair shed near the existing maintenance depot between Varanasi Junction and Lohta could give the city a local facility for major work on Vande Bharat trains, including the replacement of wheels, air-conditioning equipment and other heavy components.
Northern Railway headquarters has approved the project and the tender process has begun, according to the project update available on October 25. The new shed is planned beside the all-weather shed, also known as the Universal Washing Depot, on the Cantt–Lohta section.
The existing depot already handles washing and primary maintenance for Vande Bharat services and other long-distance express trains. The proposed addition concerns a different level of work: repairs that require specialised lifting equipment, workshop machinery and the handling of large train components.
Major repairs closer to the operating base
At present, the reported arrangement sends Vande Bharat trains requiring substantial repairs to the heavy-repair facility at Shakurbasti in New Delhi. Establishing a shed in Varanasi would add a local option rather than require every such job to be handled at that distant facility.
The plan includes new tracks inside the shed, cranes, machinery and other equipment needed by skilled mechanics. Wheels and air-conditioning units are among the components identified for replacement work. These are workshop facilities, not changes to passenger seating or onboard amenities.
A washing depot and a heavy-repair shed therefore serve related but distinct purposes. Routine attention keeps a train ready for its next service, while major component work requires space and equipment suited to lifting, removing and replacing substantial parts.
Growing network creates a maintenance requirement
The project update links the proposal to the expansion of Vande Bharat operations. Services using Varanasi Junction and Banaras connect the region with destinations including New Delhi, Ranchi, Deoghar, Meerut, Agra and Khajuraho, while the Patna–Gomtinagar service passes through the city.
Those connections explain the relevance of a local repair base, but the proposed shed does not itself announce an additional train, a revised timetable or a fare change. Passengers should continue to use the railway’s current service information for journey planning.
Approval and tendering are also different from a completed workshop. The available update does not establish an opening date for the shed, a commissioned repair capacity or a final construction cost. Those details will depend on the subsequent project stages.
For Varanasi’s railway infrastructure, the immediate development is the move towards a dedicated facility beside an existing maintenance location. Its intended role is to bring heavier repair work closer to the trains’ operating base, with construction, equipment installation and commissioning still required before that service becomes available.








