GURUGRAM: Food park promoters in the district have a detailed set of land, financing and application conditions to examine after Haryana notified its Mini Food Park Scheme on Monday, November 16, 2026. The government gazette sets out grants of 45 per cent of eligible project cost, with ceilings ranging from Rs 5 crore to Rs 15 crore, depending on the park's land area, units and investment.

For local applicants, the Directorate of MSME's official field office list identifies the District MSME Centre at Plot 2, IDC, Sector 16, Gurugram. The new notification applies across eligible areas of Haryana. It establishes a framework for applications and payments; it does not announce approval of a particular food park in Gurugram or identify local beneficiaries.

Three grant tiers and a location test

The government's November 16 gazette notification, available as an archived PDF, provides three tiers. A project with at least five acres must bring at least three units and Rs 10 crore of investment for a grant capped at Rs 5 crore. The ten acre tier requires five units and Rs 20 crore of investment, with a Rs 10 crore grant ceiling.

For projects with at least 15 acres, the requirements rise to eight units and Rs 25 crore of investment, with assistance capped at Rs 15 crore. In each tier, the percentage and the ceiling apply together. Meeting the land threshold alone is therefore insufficient to establish the amount an applicant can receive.

Minimum landMinimum unitsMinimum investmentGrant ceiling
5 acres3Rs 10 croreRs 5 crore
10 acres5Rs 20 croreRs 10 crore
15 acres8Rs 25 croreRs 15 crore

Location is another eligibility test. The scheme covers Intermediate, Sub Prime, Prime and Focus areas as defined in the notification. Its Core category covers municipal areas left outside the other categories. Industrial estate plots, industrial zones and licensed industrial colonies have separate definitions, so applicants must check their actual site's classification rather than assume that every location inside or outside a municipal boundary has the same status.

What expenditure qualifies

Eligible components include basic infrastructure such as internal roads, drainage, water and electricity supply, and common facilities such as testing laboratories, warehouses, cold storage and grading or packing facilities. Basic enabling infrastructure counts only up to 60 per cent of eligible project cost. Infrastructure outside the food park boundary is excluded from grant assistance.

The grant calculation also excludes land cost, preliminary and preoperative expenditure, and working capital margin money. The registered land value may be treated as the promoter's contribution to total project cost, but grant money cannot be used to buy the land. The notification requires at least five acres, held by purchase or a lease of at least 30 years, with the land registered in the applicant's name when applying.

The project must undergo appraisal by a bank or financial institution. A term loan must cover at least 20 per cent of total project cost, while the applicant's own equity or quasi capital contribution must also be at least 20 per cent. The applicant's net worth, or the promoters' combined net worth, must equal at least 1.5 times the grant sought.

Applicants also need the relevant planning, pollution control and statutory approvals. The document list includes a detailed project report, land title records, layout plan, loan sanction and appraisal, expenditure certificates, registration records and commitments from enterprises proposing to set up inside the park. The notification excludes a second grant for the same project component from another government source.

How applications and instalments work

The scheme operates under the Haryana Agri Business and Food Processing Policy 2026. Its stated commencement is May 29, 2026, although the detailed scheme notification is dated November 16. It runs for five years or until the policy expires or is replaced or amended, whichever is earlier. Applications must be made before commercial operations begin.

The notification directs applicants to the Invest Haryana New Single Window portal. Until that portal becomes operational, it allows the existing prescribed procedure or email submission as specified by the Directorate. It gives applicants 30 working days to correct deficiencies communicated during scrutiny. Project approval and disbursal remain subject to the scheme's checks and available budget.

Payments are divided into 40 per cent, 40 per cent and 20 per cent instalments, with expenditure and progress conditions attached. The first instalment request is due within eight months of the approval letter. Later requests have their own eight month windows measured from the previous disbursal. Applicants should therefore track approval and payment dates separately.

The official field office directory lists 0124 2334254 for Gurugram's District MSME Centre. Related local business coverage includes Everyday Prices Climb Across Varanasi Markets Ahead Of Festive Demand, Food allergy vs intolerance: the difference and limits of home tests and Choosing KENT Electric Chopper at Rs 1,449 for small prep. Those reports provide sector background, without establishing eligibility or approval under the newly notified scheme.